COMPLETE UTILITY

COMPLETE UTILITY

  • Area

    :

    1,579 square metres

  • The right of land ownership

    :

    The ownership of the buyer.

  • Road

    :

    The main access road 40 meters wide, six-lane road, load capacity of 26 tons.

  • Electricity

    :

    The electricity from sub power plants can produce electricity 115 kv./22 kv.

  • Water supply System

    :

    Capacity of 3,000 cubic meters/day by using an Ultra Filtration System (U.F.) and Reverse Osmosis System (OR)

  • :

    Can treatment wastewater 10,500 cubic meters/day and increased by demand.

  • Waste Disposal system

    :

    Garbage (Except hazardous waste collection services) requires the use of a collection car from Sinsakhon Facilities Services Co.,Ltd..

  • Fire safety

    :

    Firefighting dispenser installed every 75 meters, fire trucks are ready 24 hours a day.

  • Security systems

    :

    Installation of CCTV cameras and security guards 24 hours a day.

  • Flood protection system

    :

    Preparing soil ridge for flood protection height +2.60 meters surrounding the settlement area and installing 5 water pumps from wells Retention Pond.

  • Environmental Management System

    :

    A certification standard ISO 14001:2004 Environmental Management System.

  • Telephone/Internet system

    :

    Provide from a service companies as follows :
       1. TOT Public Company Limited
       2.True Corporation Public Company Limited
       3.CAT Telecom Public Company Limited